ASME BPVC SECTION IX WELDING_TRAINING - PART 17

How to Prepare a pWPS?
--------------------------------------------------------------------------------------------------------------------------

Example situation for filling pWPS. CASE 1

We have to weld a pipe to pipe joint using GTAW welding. The material of the pipe is SA106 Gr B, 2" X Sch 40. Prepare the pWPS (Proposed Welding Procedure Specification) for the same.
--------------------------------------------------------------------------------------------------------------------------
Previous Blog: 

https://hareeshkv.blogspot.com/2018/08/asme-bpvc-section-ix-weldingtraining.html

--------------------------------------------------------------------------------------------------------------------------
Please see the format in the previous blog for number references.
Reference Numbers: 31A to 44B



Disclaimer: Photos are taken from different websites. If this violates any copyright rules this will be removed. Please inform me if any of the photos or contents violates copyright rules. (through 13hareesh13@gmail.com). This blog is meant for educational purpose only. If it is used for any other means without the written consent from the author, the author will not be responsible. Author does not guarantee the accuracy of data used in this blog.All the information, data, photo/image, calculations presented in this blog should be used at the sole risk of the user. The blogger is not liable or responsible in any way for any damage, losses or costs arising from use of the blog for any purpose whatsoever or whosoever it may be. The blog is to be used at your sole risk and responsibility.




Comments

  1. I like t the way how welding procedure factors has been explained it's really informative, Keep up the good work!

    https://jc-tool.com

    ReplyDelete

Post a Comment