How to decide the PQR requirements in a project?

Please see example in the below tables in which how can we come to a conclusion of the number of PQR tests required.

In a project we collected the details (for deciding the PQR requirements) as below.


From the above data the PQR requirements are derived as in the below table.


Now may be there is a question in your mind why for the material carbon steel - water line and carbon steel - Process Liquid Line different process are used. It is as per the project requirements only.

Below is another project. Column 1 to 5 contains the collected data and column 6 & 7 are the requirements of PQR (we derived from the data) for that project.




Disclaimer: Photos are taken from different websites. If this violates any copyright rules this will be removed. Please inform me if any of the photos or contents violates copyright rules. (through 13hareesh13@gmail.com). This blog is meant for educational purpose only. If it is used for any other means without the written consent from the author, the author will not be responsible. Author does not guarantee the accuracy of data used in this blog.All the information, data, photo/image, calculations presented in this blog should be used at the sole risk of the user. The blogger is not liable or responsible in any way for any damage, losses or costs arising from use of the blog for any purpose whatsoever or whosoever it may be. The blog is to be used at your sole risk and responsibility.