Some important points from ASME B 31.3
1. Tack welding can be done only by a qualified welder.
Refer: ASME B 31.3 Clause: 328.5.1 (c)
2. How much can a branch pipe be inserted to the run pipe?
Refer: ASME B 31.3 Clause: 328.4.3 (c)(1)
3. How much should be the preheating area near a weld joint?
Refer: ASME B 31.3 Clause: 330.1.4
4. What are the conditions when PWHT is not required, if the general condition of the job requires PWHT?
Refer: ASME B 31.3 Clause: 331.1.3 (b)
5. What is the % of hardness test required after PWHT?
Refer: ASME B 31.3 Clause: 331.1.7
6. How much should be the PWHT area near a weld joint?
Refer: ASME B 31.3 Clause: 331.2.6
7. Preheat temperatures for different materials.
Refer: ASME B 31.3 Table 330.1.1
8. Requirements for heat treatment.
Refer: ASME B 31.3 Clause: 331.1.1
9. Minimum welding dimensions for socket welding components other than flanges.
Refer: ASME B 31.3 Fig 328.5.2C
10. Typical details for double welded slip on and socket welding flange attachment welds.
Refer: ASME B 31.3 Clause: 328.5.2B
8. Requirements for heat treatment.
Refer: ASME B 31.3 Clause: 331.1.1
9. Minimum welding dimensions for socket welding components other than flanges.
Refer: ASME B 31.3 Fig 328.5.2C
10. Typical details for double welded slip on and socket welding flange attachment welds.
Refer: ASME B 31.3 Clause: 328.5.2B